| 1 | Supplier Credentials | Confirm legal registration, export experience, quality procedures, production capacity, and references for projects with similar volumes. | Business registration documents, trade references, factory or quarry audit, and recent project records. | Documents should be current, consistent, and independently verifiable. | Unverifiable certificates, unclear ownership, or no evidence of comparable deliveries. |
| 2 | Quarry Source | Identify the exact quarry, geological formation, available reserve, extraction method, and distance to the processing facility. | Quarry location, extraction permit, source photos, geological description, and production visit. | The quoted material should come from the same declared source throughout the project. | Substituting blocks from different quarries without written approval can change color and performance. |
| 3 | Petrographic Composition | Check grain size, cement type, mineral content, bedding, laminations, and visible clay or iron-rich zones. | Petrographic examination by a qualified laboratory and representative quarry samples. | The petrographic profile should match the intended indoor or outdoor application. | Weak bedding planes, swelling clay, or high iron content may increase durability and staining concerns. |
| 4 | Dimensional Tolerances | Define permitted variation in length, width, thickness, squareness, flatness, and edge condition before production. | Inspection plan, calibrated measuring tools, approved shop drawings, and pre-shipment dimensional reports. | Use project specifications or the applicable stone standard; do not rely on “standard tolerance” alone. | Inconsistent thickness may create installation delays, excessive adhesive use, or uneven façades. |
| 5 | Physical Performance | Evaluate water absorption, apparent density, compressive strength, flexural strength, and abrasion resistance for the planned use. | Independent laboratory test reports using recognized ASTM, EN, or equivalent methods. | Set project-specific limits based on climate, traffic, thickness, fixing method, and structural design. | A test result without the method, specimen direction, age, or sample identification is incomplete. |
| 6 | Freeze–Thaw and Weathering | Assess suitability for repeated freezing, wetting, salt exposure, strong sunlight, and temperature changes. | Freeze–thaw cycling, salt crystallization, and wet–dry durability tests where the climate requires them. | Require performance data that reflects the actual installation environment, not only a general product datasheet. | High porosity and poorly bonded grains can lead to scaling, cracking, or surface loss outdoors. |
| 7 | Color and Pattern Consistency | Review background color, veining, fossil marks, natural holes, surface texture, and acceptable variation across batches. | Large representative mock-up, dry-lay review, batch photographs, and approved control samples. | Approve a range of natural variation rather than a single small sample. | Small samples may hide batch variation, shade changes, or differences between quarry benches. |
| 8 | Surface Finish and Treatment | Specify sawn, honed, brushed, sandblasted, tumbled, or other finishes, including sealers and edge profiles. | Approved finish sample, slip-resistance data where relevant, sealer compatibility test, and maintenance instructions. | The finished surface should meet appearance, traction, cleaning, and slip-resistance requirements. | Unapproved coatings can darken sandstone, trap moisture, or reduce repairability. |
| 9 | Packing and International Shipping | Check crate design, moisture protection, labeling, pallet weight, container loading, documentation, and Incoterms. | Packing list, loading photographs, crate inspection, shipping marks, and agreed damage-claim procedure. | Each crate should be traceable to a batch, quantity, size, finish, and inspection record. | Insufficient bracing, mixed batches, and unclear responsibility for transit damage create costly disputes. |
| 10 | Pre-Shipment Quality Control | Confirm inspection frequency, sampling method, defect classification, corrective action, and final approval responsibility. | Third-party inspection, batch-based checklist, nonconformance report, and retained reference samples. | Release shipment only after dimensions, finish, appearance, quantity, and packing meet the purchase specification. | Relying only on visual inspection can miss absorption, strength, thickness, and long-term durability issues. |