| Cleanroom Design Expertise | Proper airflow, pressure cascades, zoning, material selection, and maintainability are essential for contamination control. | Design calculations, room data sheets, airflow schematics, pressure cascade diagrams, risk assessments, and design review records. | Design is based on the applicable ISO 14644 series and clearly defines cleanliness, pressure, temperature, humidity, airflow, and recovery requirements. | 15% |
| Relevant Industry Experience | Different sectors have different contamination, hygiene, validation, and documentation requirements. | Non-confidential project references, sector-specific case studies, installation photographs, and descriptions of similar room classifications and processes. | Demonstrated experience with projects of comparable size, cleanliness classification, utilities, regulatory expectations, and operational complexity. | 12% |
| ISO 14644 Competence | ISO 14644 provides internationally recognized principles for cleanroom classification, testing, monitoring, and operation. | Testing procedures, classification reports, sampling plans, acceptance criteria, and personnel competency records. | The manufacturer can explain and apply ISO 14644-1 classification, ISO 14644-2 monitoring, and ISO 14644-3 test methods where relevant. | 12% |
| Quality Management System | A controlled quality system reduces design errors, documentation gaps, installation defects, and inconsistent project delivery. | Current ISO 9001 certificate, scope of certification, internal quality procedures, nonconformance process, and corrective-action records. | A current, independently issued ISO 9001 certificate covers the design, manufacture, installation, or service activities being purchased. | 10% |
| Regulatory and GMP Knowledge | Pharmaceutical, biotechnology, medical-device, food, and healthcare projects may require different regulatory controls. | Compliance matrix, user-requirement review, validation documents, training records, and examples of regulatory inspection support. | For sterile medicinal-product facilities, the design team understands applicable GMP requirements, including EU GMP Annex 1 where applicable; other sectors are mapped to their relevant regulations. | 10% |
| HEPA/ULPA Filtration and Airflow | Filtration efficiency and airflow distribution directly influence airborne particle control and product protection. | Filter specifications, certificates, installation details, airflow calculations, terminal-filter layouts, and test procedures. | Filter selection is matched to the risk assessment, and installed filters are tested for integrity and leakage using an accepted in-situ method before handover. | 10% |
| Testing and Commissioning Capability | Commissioning confirms that the completed room performs according to the approved design rather than only appearing visually complete. | Commissioning plan, test instruments and calibration certificates, test reports, deviation log, and final acceptance documentation. | Testing addresses applicable items such as particle classification, airflow volume or velocity, pressure differential, HEPA integrity, recovery, temperature, and humidity. | 12% |
| Validation and Documentation | Accurate documentation supports qualification, regulatory review, training, maintenance, and future modifications. | URS review, design qualification support, installation and operational qualification templates, as-built drawings, manuals, and spare-parts lists. | Documentation is traceable to approved requirements and includes equipment schedules, control logic, material certificates, test results, and change history. | 8% |
| Material and Construction Quality | Smooth, cleanable, durable surfaces reduce particle generation, microbial harborage, corrosion, and maintenance problems. | Panel and finish specifications, joint details, door and window specifications, sealant information, and cleaning compatibility data. | Surfaces are non-shedding, sealed, cleanable, and compatible with the intended cleaning agents and operating environment; interfaces are detailed to minimize ledges and gaps. | 7% |
| After-Sales Service and Maintenance | Filters, controls, sensors, doors, seals, and HVAC components require planned maintenance to preserve performance. | Service-level agreement, response times, preventive-maintenance schedule, spare-parts policy, training plan, and warranty terms. | The supplier provides documented maintenance procedures, recommended test intervals, calibration support, replacement-part availability, and defined escalation routes. | 4% |