| Mixing Performance | Uniform dispersion of stabilizers, pigments, fillers, and plasticizers without visible agglomeration. | Factory trial report, sample formulation, mixing-time records, and temperature curves. | 20% | Accept only after a witnessed production test. |
| Temperature Control | Accurate monitoring of heating and cooling stages, with repeatable batch-to-batch control. | Calibration records, sensor specifications, PLC control description, and batch-history data. | 15% | Verify actual readings against a calibrated reference instrument. |
| Material and Fabrication Quality | Product-contact parts should use suitable corrosion-resistant materials; welds and rotating parts should be inspected. | Material certificates, welding inspection records, component list, and surface-finish specifications. | 15% | Give priority to traceable materials and documented inspections. |
| Customization Capability | Configuration should match batch size, powder characteristics, production layout, voltage, and automation requirements. | General arrangement drawing, utility list, control philosophy, customized quotation, and interface drawings. | 15% | Confirm that changes are engineered rather than copied from a standard model. |
| Safety and Compliance | Guarding, emergency stops, interlocks, electrical protection, and operating instructions should be included. | Risk assessment, electrical diagram, safety-function test, user manual, and applicable conformity documents. | 15% | Reject proposals with incomplete safety documentation. |
| Factory Acceptance Testing | Testing should cover empty running, loaded running, temperature control, discharge, noise, and emergency functions. | Signed FAT procedure, test results, video evidence, punch list, and corrective-action records. | 10% | Use measurable acceptance criteria before placing the order. |
| After-Sales Support | Clear warranty terms, spare-parts availability, remote troubleshooting, and commissioning support. | Warranty policy, response-time commitment, spare-parts list, service contacts, and commissioning plan. | 10% | Prefer written service commitments over informal assurances. |